Description: Prairie Crane was tasked with installing a temporary bridge in a northern community after the existing bridge burned down. The client built a stable pad on the south side of the river for the first and second spans, and the second span was set onto an island mid-river.
The crane then drove out and set up on five feet of matting under each outrigger on either side of the bridge, and the final span was lifted and set from there to complete the project.