← All Projects

Industrial

Second Level Mechanical Unit Installation

Description: Prairie Crane was brought in to place six large mechanical units through a wall on the second level of a building. Rigging them and sliding them in with a single crane was a significant challenge given the tight working area.

The crew built a system of chain falls to release the rigging in stages. That kept the rigging clear of the building as each unit slid in, and allowed it to be cut free before the next section was started.

Created on Moseik